We undertake the mechanical & electrical installation of:
- Water for Injection (WFI) Storage & Distribution Systems
- Purified Water Storage & Distribution Systems
- Pure Steam
- Demineralised Water
- CIP/SIP
- Product Process Lines
Our systems comply to cGMP standards and fully meet regulatory bodies FDA / MHRA criteria.
Storage & Distribution Systems supplied and installed by HEES are fully compliant to ASME BPE standards.
Industry standards used during the design, manufacturing and testing of systems:
- Mechanical Design cGMP, ASME
- Electricity IEC, EN & NEMA Standards
- Control System Design GAMP, V4.0
All welding technicians are qualified to BS EN287-1 with weld procedure compliant to BS EN288-3 for both MMA and TIG processes.
HEES utilise 'Orbimatic' programmable orbital welding equipment, micro-processor controlled with fully enclosed weld heads to meet industry weld quality requirements.
System Validation
Control of the qualification process is undertaken by HEES with record documentation to verify the Installation Qualification IQ process.
Our documentation package includes:
- Isometric Drawings
- Weld Logs
- Weld Procedures
- Welder Qualifications
- Boroscopy Report
- Passivation Certificate/Protocols
- Testing Records
- As-Built Drawings
- System Completion Certificate
Site by: Dijit new Media