The new plant will improve the control of coolant distribution to support the new phases of WFI distribution due to come on line during the summer of 2009.
An additional benefit will be an increased production capacity reduced losses and shorter sub loop cooling times.
A Key issue was the current limitations of the cooling water system to cope with the increased demands as a result of the increased throughput in manufacturing and the additional requirements that the WFI projects will bring.
The system upgrade will reduce the risk of production delays due to unreliable WFI delivery at the user points.
See current project for more information.